Contact Us

Blower Fan some failures Measures

Date: 2016-6-2   Click: 1476 Times

After "Blower Fan" started to slow expansion of production need to adjust the pressure according to the opening degree with diffuser "on" button and the "Close" key control to ensure the necessary air flow. Fan operation, the fan must be constantly monitored, pay attention to the fan current, temperature, oil pressure vacuum inlet of the sound, fan, temperature, vibration and so on. Time and make a record and, if abnormal, to promptly identify the reasons given to exclude and report production department, emergency stop can take action when necessary (use caution). Due to the production or maintenance, repair needs, stop the operation of a wind turbine. 1, to reduce the degree of opening of the diffuser to a minimum (minimum instruction diffuser green light). 2, with a finger touching the fan "Stop" button, the program began to shut down.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

网站地图榴莲视频APP下载网址进入网站免费 榴莲视频免费观看 榴莲APP下载网址进入18免费安卓 秋葵榴莲在线APP官网 草莓视频在线下载 黄瓜视频污在线观看 丝瓜视频成人APP色版网站 草莓视频在线看免费 茄子视频免费下载 黄瓜黄色视频下载